Nov 18, 2012

White and lights

Remember the flowery tiles in our upstairs bathroom? And the painting incidence with a wrong primer? Eventually leading to ripping off the old tiles? And subsequently blowing up (also) the bathroom budget.

Before no. 1
Before no. 2
Finally, 1.5 months later we have a fully functional bathroom again! The walls are ready, new cupboards are up and the bathroom has electricity and thus lights. Which means one can actually close the door if one wishes to have some privacy. And thus we no longer do the dishes in the dark!!

After no. 1

After no. 2

Nov 13, 2012

Kitchen assembly, day 3

Kitchen assembly continues in good speed. Today the front panels of the drawers, induction cooktop as well as the corian counter were installed. Below there are some shots of the beautiful details and careful, extremely professional finish of the different parts. We take our hats off to kindly thank Puupalvelu Rajala for the superb job done so far!

Drawer front panels
Missing only the sliding doors
Induction cooktop and Corian counter
The far corner

Nov 11, 2012

House Bird for the Father


When we still lived in Tapiola, there was an apartment we used to walk by very often. Through the window we always admired an Eames House Bird the owners had placed sitting on top of the fireplace. So it was quite fitting that for the very first Father's Day, Pekka received a House Bird of his own as a present (in addition to the traditional underwear and pajama pants, of course).  
Eames House Bird
Actually, the House Bird is not really an Eames design, but originally a work of American folk art from 1910 that the Eames found in their travels and installed in their Pacific Palisades living room. This beautiful black bird fits like a glow also to the top of our fireplace!
Beak up!
On top of the fireplace next to the House Bird is a teak ice bucket by Danish designer Jens Quistgaard from 1958. It was found from a Swedish internet auction a few years ago. It is beautiful as well, but was just too big for our previous apartment. Again, one more reason to be happy for the new home!
Staring to the horizon

Nov 10, 2012

Kitchen assembly, day 2

Things in the kitchen are moving forward quite fast. After the second day, it is already starting to look like a proper kitchen, and so far, we are quite happy with the SOMEWHAT experimental design. About half of the cupboards are already up, the fridge/freezer and the dishwasher have found their places and the drawers are already there.

Fridge/freezer and integrated dishwasher (w/o door). Thank you Aki!
For a long time, we were contemplating the kitchen color palette, and originally thought of choosing a darker veneer for the wooden parts. However, as the original floor and ceiling are lighter, in the end we decided on a lighter, more Scandinavian tone in the kitchen as well. And indeed, it seems to be working quite well!

First installed drawer unit
One of the most experimental approaches in our kitchen will be the extractor hood. We didn't want to look at an ugly metal piece in such a central place of our home, and therefore the extractor hood will be hidden behind sliding doors. The extractor hood we chose is meant to be attached to the ceiling in a horizontal position, and for this reason, it has a very powerful motor. The powerful motor comes especially handy if you decide to change the horizontal hood position to vertical (in order to fit the hood to the space behind the doors) and still hope to create enough suction. Nobody knows if it will, only time will tell...

Extractor hood intake
Extractor hood motor and air ventilation tube - something missing?
Another detail which was finished today was the cabinet doors on the hallway and study room. We decided to replace the old doors which originally had two separate doors, the upper and the lower for each cabinet, with one single door for each cabinet. This makes the visual appearance a bit more simple. Naturally, the old vintage handles were cleaned and reused. 

New doors, old vintage handles

Hello kitchen!

We are delighted to report a major milestone: the assembly of our kitchen has started! Once ready and operative, it is needless to mention we won't be missing noodles and microwave meals, but have a new born appreciation to home cooked meals! Also, washing dishes in a dishwasher instead of a bathroom sink will feel like a significant upgrade!

Blueprints
In this "design-it-yourself" -kitchen, we have faced some challenges along the way resulting in certain alterations in the original design. Currently maybe the most burning issue is the fact that one of the parts of the air extractor fan ordered from Germany was not delivered. And guess what this means? Yes, another delay of three weeks. But hey, who cooks with the fan on anyways?

First cabinets up
Some serious drawer space
Today Urho celebrated his second birthday. Congratulations! Also, at this point of the renovation, Urho has already learned to trust the team and their ability to work without his continuous supervision. So, he took the opportunity to take a nap in the sunny end of the living room couch. Oh yeah, what a life!

Napping birthday dog

Nov 5, 2012

Backyard cleanup

In addition to fixing up inside the aparment, with the autumn falling the backyard also needed some work desperately. The two major pine trees had been taken down already before, but there were still some smaller spruces remaining. We decided to get rid of all but one of those. With all the raked autumn leaves, fallen tree trunks and other garbage, altogether ten sacks of garbage was removed and transferred through the apartment to a nearby "dump spot".

Pile of junk and an exploring sausage dog
Bush of unidentified species, trimmed
An interesting detail of the clean up op related to the sauna air intake tube. We hadn't really paid much attention to this particular tube, but after our kind neighbor kindly hinted that most likely the outside end of the tube is covered up by a pile of firewood (which of course it shouldn't) Pekka did a bit of exploring and found that not only was the end of the tube covered by the pile of wood, it was also buried underground and completely blocked by junk. This is where creativity comes into picture: first, a poker from the fireplace was used to puncture and remove a bottle of shampoo jammed inside the tube. Second, a diving stage bottle filled with pressured air was quite a handy tool to clean the rest of the junk out and open the airway. 

Outside end discovered
Inside end and some freshly painted tile wall
Urho really, really enjoys the backyard access. For a small dog such as himself, there is quite a lot of new leads to explore, which of course, is rather exciting. However, maybe even a more important aspect is the fact that when it rains, the "bathroom" is close. If Urho had it's way, we would be building a small canopy for him to always guarantee a bathroom experience as pleasant as possible.

The Scary Watch Dog

Oct 28, 2012

Sauna

Considering we live in Finland, an extremely important milestone was achieved today. The sauna stove stones were returned in their place, and the sauna steam room was heated up for the first time. Thanks to the previous owner and the two big pine trees taken down earlier, we have tons of wood to burn both in sauna and upstairs fire place. Yes, sauna was fantastic! And yes, it is absolutely true what they say, you can indeed tell the difference between the electric and wood heated stove!

First sauna fire